Investment implementation
Construction of the second technological line in the Thermal Processing with Energy Recovery Plant in Rzeszów
Scope of electrical work performed:
1. Installation of cable routes
• Installation of support structures (threaded pins, brackets, anchors).
• Installation of galvanised cable trays and cable ladders.
• Installation of routes in technological rooms and on the roof of the facility.
2. Cable laying
• Marking and numbering of cables.
• Laying of cables in accordance with technical documentation.
3. Installation and preparation of switchgear
• Installation of switchgear cabinets.
• Introduction and organisation of cables in cabinets.
• Preparation of the installation for commissioning and measurements.